CANOPY PANEL

PREFORMED METAL ROOFING

 1.         WORK SPECIFIED HEREIN

1.1       All labor, material, equipment, and services necessary to furnish and install metal roofing as shown  or specified, including accessories contiguous with the roofing.

 2.         SPECIFIED PRODUCTS  AND SUBSTITUTIONS

            2.1       In accordance with Section 01600.

 3.        SUBMITTALS

            3.1       Submittals required in accordance with Section 01300.

            3.2       Submit detailed Product Data including complete installation details.

3.3       Submit Shop Drawings showing seams, flashing, ridges, gutters, and fascia details.  Show size, type of joints and locations, fasteners, special shapes and construction details of work, including provisions for expansion and contraction, prior to fabrication and delivery.

3.4       Submit 12 inch by 12 inch Samples of sheet metal material.  Sample shall indicate finish, color and thickness.

            3.5       Submit complete color chart for Architect's color selection.

            3.6       Submit evidence of panel system’s compliance with the following test standards:

 4.               QUALITY ASSURANCE

            4.1       Applicable standards:

4.1.1   SMACNA: “Architectural Sheet Metal Manual”, Sheet Metal and Air Conditioning Contractors National Association, Inc.

 4.1.2   AISC: “Steel Construction Manual”, American Institute of Steel Construction.

 4.1.3   AISI: “Cold Form Steel Design Manual”, American Iron and Steel Institute.

4.2       Manufacturer’s qualifications:

 4.2.1   Manufacturer has a minimum of three years experience in manufacturing panels of this nature. 

4.3       Installer’s qualifications:

 4.3.1   Installer of the system shall be an approved installer, certified by the manufacturer, and meet the following minimum criteria:

 4.3.2   Maintain general liability coverage for each loss as required by contract.

 4.3.3   Maintain sufficient worker’s compensation coverage as mandated by law.

 4.3.4   Has no viable claims pending regarding negligent acts or defective workmanship on previously performed or current projects.

4.3.5   Has not filed for protection from creditors under any state or federal insolvency or debtor relief statutes or codes.

4.3.6   Project foreman is the person having received specific training in the proper installation of the specified system and will be present to supervise whenever material is being installed. 

4.3.7   Provide five references from five different architects or building owners for projects that have been in service for a minimum of two years, stating satisfactory performance by the installer.

4.3.8   Provide certification letter that installer has a minimum of three years of metal product installation experience immediately preceding the date upon which work is to commence.

4.4       Pre-installation Conference:

4.4.1    Prior to installation of roofing system, conduct a pre-installation conference at the project site.

4.4.2    Attendance:  Owner, Architect, Contractor, Project Superintendent, and Roof Applicator

4.4.3    Agenda: 

4.4.3.1             Roofing details and agenda

4.4.3.2             Critical work sequencing and review of phasing plan

                                    4.4.3.3             Inspection sequencing

 5.               MATERIALS

 5.1      Metal roof system profile:

5.1.1    Products –Shur-Lock Canopy Panel, as manufactured by AARA Architectural Metals.

5.1.2    3”-inch high minimum rib x 16 inch, wide panel (nominal).

 5.2      Gauge:

5.2.1    20 gauge

5.3       Substrate:

5.3.1    Zincalume®

5.4       Finish:

5.4.1    Fluoropolymer coating produced with Kynar 500 or Hylar 5000 resin (20 year warranty).

            5.5       Color:

 5.5.1   Selected from standard colors.

5.6       Acceptable manufacturer:

                        5.6.1    AARA Architectural Metals, 4328 E. Magnolia, Phoenix, AZ 85034, (602) 437-9323

            5.7       Other manufacturers desiring approval comply with Section 01600.

            5.8       Fasteners:

 5.8.1   Roof fasteners shall be approved by the metal roof manufacturer.

5.8.1.1             Use compatible fasteners for all applications. Any exposed fasteners shall be color of metal roof system.

5.8.1.2             Locate and space any exposed fasteners in a true vertical and horizontal alignment. 

 6.                ACCESSORIES

6.1       Provide all components required per the metal roof system manufacturer’s approved shop drawings for a complete metal roof system to include panels, trim/flashing, fascias, ridge, closures, sealants, fillers and any other required items.

6.1.1    All tape seal is to be a pressure sensitive, 100 percent solids, polyisobutylene compound sealing tape with a release paper backing.  Provide permanently elastic, non-sagging, non-toxic, non-staining tape seal approved by the metal roof system manufacturer.

6.1.2    All joint sealant is to be a one-part elastomeric polyurethane sealant approved by the metal roof system manufacturer.

            6.2              Fabrication:

6.2.1    Panels to be factory formed in continuous lengths.(Maximum continuous length 30’-0”)

6.2.2    Fabricate trim/flashing and accessories to detailed profiles.

                        6.2.3    Fabricate trim/flashing from same material as panel.

 7.               EXECUTION

7.1       Inspect installed work of other trades and verify that such work is complete to a point where this work may continue.

7.2       Verify that installation is made in accordance with approved shop drawings and manufacturer’s instructions. 

            7.3       Installation

7.3.1   Install panels plumb, level and straight with seams and ribs parallel, conforming to design as indicated.

  8.               CLEANING

8.1       Dispose of excess materials and remove debris from site.

8.2       Clean work in accordance with manufacturer’s recommendations.

8.3       Touch up minor scratches and abrasions.

 9.               PROJECT CLOSE-OUT

9.1       Issue a written warranty to the Owner to maintain the roof and flashing in a watertight condition for a period of two years from the date of substantial completion.

            9.2       Issue a written 20-year guarantee from the manufacturer for the panel finish system.

END OF SECTION